Siding Replacement Cost Calculator

MaterialInstalled $/sq ft1,800 sq ft, 2-story, with tear-offMid
Vinyl$4.5-9$11,100 - $22,200$16,700
Fiber cement$6-13$14,200 - $30,500$22,400
Engineered wood$5-11$12,200 - $26,400$19,300
Cedar / real wood$7-14$16,300 - $32,600$24,400
Steel$8-14$18,400 - $32,600$25,500
–mid estimate, installed
–band low
–band high
–per square (100 sq ft)
Bands are national installed ranges; the story premium is ladder and staging, and tear-off adds $1-2 a sq ft with disposal. One legal line most calculators skip: on a pre-1978 home, disturbing painted siding falls under the EPA Lead Renovation, Repair and Painting rule - a certified firm and lead-safe practices are part of an honest bid.
The exterior neighbors: roof replacement, windows, garage door, driveway paving, and the gutter table for the edges.

Siding is priced by the square foot of wall, not the floor plan - a typical two-story home carries 1,500-2,500 sq ft of wall area once gables are counted, and that number times a material band is the whole bid. Installed ranges run $4.50-9 per sq ft for vinyl, $6-13 for fiber cement, $5-11 for engineered wood, $7-14 for cedar, and $8-14 for steel.

The two lines quotes like to forget: every extra story adds ladder, staging and labor - call it 15 percent for a second floor and 25 for a third - and removing the old siding plus disposal adds $1-2 per sq ft. On an 1,800 sq ft two-story re-side, that is the difference between a $14,000 vinyl job and a $16,700 one.

One legal line most calculators skip: if the house was built before 1978, tearing off painted siding disturbs lead paint, and federal law - the EPA Renovation, Repair and Painting rule - requires a certified firm and lead-safe practices. It is a real cost line, and the reason an honest bid on an older home is sometimes the higher one.

How to use

  1. Measure wall area, not floor area: perimeter times wall height, minus windows and doors (about 15 percent of the total), plus gables - or reuse the wall number from a previous quote.
  2. Pick the material band: vinyl is the value play, fiber cement the durability-and-fire play, engineered wood the middle path, cedar the look, steel the coastal pick.
  3. Set stories and tear-off honestly - the staging premium and the removal line are where bids quietly diverge by thousands.
  4. Compare the mid estimate to your bids, then make each bidder itemize tear-off, disposal, trim, soffits and wrap - those are the classic exclusions.
Good to know โ€” Siding math at 2025-26 installed bands: vinyl $4.50-9, fiber cement $6-13, engineered wood $5-11, cedar $7-14, steel $8-14 per sq ft; second story +15 percent, third +25; tear-off and disposal +$1-2 per sq ft. An 1,800 sq ft two-story with tear-off: vinyl mid $16,700 (band $11,100-22,200), fiber cement mid $22,400 ($14,200-30,500), engineered wood mid $19,300 ($12,200-26,400), cedar mid $24,400 ($16,300-32,600). Pre-1978 painted siding triggers EPA lead-safe rules.
Quick reference โ€” Bid-proofing, in order: get the wall-area number in writing (it is the whole game), make tear-off, disposal and trim line items rather than allowances, ask what happens if wet sheathing shows up under the old siding (the change order almost everyone meets), and on a pre-1978 house ask for the EPA lead-safe certification number before the first saw cut.

Frequently asked questions

How much does it cost to side a 2,000 sq ft house?

Wall area on a 2,000 sq ft floor plan typically runs 1,600-2,400 sq ft. At 2,000 wall sq ft, two stories, full tear-off: vinyl lands about $12,400-24,700 (mid $18,500), fiber cement about $15,800-33,900 (mid $24,900), cedar about $18,100-36,200 (mid $27,200). A single story trims each figure by roughly 13 percent; skipping tear-off saves $2,000-4,000.

Is it cheaper to paint or replace siding?

If the siding is structurally sound, repainting runs about $1-3 per sq ft and buys 5-8 years - the cheap move. Replace when paint stops sticking to chalked or warped boards, when annual repair passes roughly a third of re-side cost, or when you want the reset in condition and curb appeal. Painting rotted wood is rent, not ownership: the rot continues behind the paint.

What is a square of siding, and why do bids use it?

A square is 100 sq ft, the unit siding is ordered in, with cut waste built into a normal order. Base installed bands per square: vinyl $450-900, engineered wood $500-1,100, fiber cement $600-1,300, cedar $700-1,400, steel $800-1,400 - before the story and tear-off multipliers. Any bid that never states the square count of your walls is guessing.

Does new siding add value or insulation?

Resale recoups most of the cost - vinyl re-side has historically returned about three quarters at sale, the strongest of the exterior trades - and insulated vinyl adds only R-2 to R-4, worth single-digit percentages on heating bills, not a payback story. The honest case is condition: new siding stops water where it starts and resets thirty years of maintenance.

Do I need a permit or lead-safe certification to replace siding?

Most towns want a permit for a full re-side (a few hundred dollars, often folded into bids). If the home predates 1978, the EPA RRP rule applies: the contractor must be an EPA certified firm using lead-safe work practices. Doing it yourself stays legal on your own home, but the certification is what keeps resale disclosure quiet - ask for the cert number; it is a five-second check.

Related tools